Uganda and Tanzania have renewed their commitment to strengthening regional trade, infrastructure development and industrialisation following a two-day state visit by Tanzanian President Dr. Samia Suluhu Hassan from November 18–19, 2026.
During bilateral talks at State House Entebbe, President Yoweri Kaguta Museveni and President Hassan agreed to fast-track major infrastructure projects, including the East African Crude Oil Pipeline (EACOP), which is now 93.9 per cent complete, and the Standard Gauge Railway (SGR).
The discussions also focused on strengthening electricity connectivity through a proposed 400kV interconnector, developing Tanzania’s Tanga into a regional energy hub for petroleum storage, refining and distribution, and removing non-tariff trade barriers to ease the movement of goods and services.
The two leaders further supported improved transport links through Lake Victoria, including upgrading Port Bell and strengthening its railway connection to Kampala to facilitate regional cargo and passenger movement. They also welcomed a framework agreement for the Isaka–Lusahunga–Murongo/Kikagati–Mpondwe railway project.
On Thursday, the Presidents commissioned the **Double Q Automotive Assembly Plant in Mpigi District, reinforcing Uganda’s ambition to expand local manufacturing, attract investment and create industrial opportunities.
The visit concluded with a renewed commitment to translate bilateral agreements into practical results, deepen East African Community integration and promote shared prosperity through cooperation in energy, transport, trade and industrial production.



